Views: 3 Author: Site Editor Publish Time: 2024-04-28 Origin: Site
1. Clean the dust in the electrical box regularly (according to the usage), check whether the wiring terminals and the screws of each component are loose, to ensure the safe and reliable use of the circuit.
2. After the machine is used every time or tomorrow, be sure to clean up the dust and debris on the platform and transmission system (if it is not cleaned, a lot of dust and impurities will enter the screw, guide rail and bearing under long-term operation. It's just that the rotation resistance of the lead screw and the bearing is large, which leads to the phenomenon of step and dislocation when the engraving speed is slightly faster), and the transmission system (X, Y, Z axis) is lubricated and oiled regularly (weekly).
3. It is recommended that the continuous running time of the machine be controlled below 10 hours per day.
4. The water pump and the spindle are mutually interrelated. It is necessary to check to replace the circulating water for the machine, to keep the water clean to prevent the water outlet of the pump from being blocked, and to prevent the water-cooled spindle from running at high temperatures and causing component damage; to ensure the normal operation of the water pump, Never make the water-cooled spindle appear water shortage.
5. If the machine is not used for a long time, it should be lubricated regularly (weekly) and then run empty to ensure the flexibility of the transmission system.