Engraving machine if it is in the operation period, should be in the longest three days time, the guide rail, rack, screw on the dust, mud and sand to sort out a time, and brush on the guide rail oil, (stop the use of grease).
Regularly tidy up the screw, to avoid foreign objects sticking on the screw, the screw is very important in the equipment, he resolved the accuracy of the machine, and the screw also plays an important role in the transmission process.After the operation should be timely to tidy up the table, which will give the stone engraving machine next operation to provide convenience.Tidy up the guide rail and guide rail around the material chip, in order to avoid due to debris interference caused by the machine in the process of operation presents card machine.
On the oil after adding oil slow back and forth to ensure that the lubricant can be evenly added to the guide and screw.
If the machine is not used for a long time, it should be refuelled regularly to ensure the flexibility of the transmission system.The first clean guide rail and screw, you can use cloth (not hair) to guide rail and screw on the oil and material debris sorted out.Because of the low temperature, the guide rail and screw can be added oil, the best add anti-freezing oil.Refuelling cycle is twice a month, that is, every fortnight to add oil.
Often check the dustproof, waterproof function, look at the dust cloth with or without wear, if there is wear and tear, water, mud, dust can be through the dust cloth directly splashed to the guide, rack, if the work is not particularly busy, should be suspended immediately, and contact with the manufacturer, procurement of a new dust cloth for replacement.
In the carving process, the cutter head needs to add water for cooling, in the process of adding water, cooling water should be aimed at the cutter head spray, not to the handle spray, to the handle, can form the spindle into the water short circuit.
Every six months time to check the X, Y-axis belt wear condition, if the wear is more serious stone engraving machine, should be purchased from the manufacturer of the belt, to replace.
Stone engraving machine circulating water in the tank, according to the amount of work, and the concentration of sediment in the water, should be replaced in 2-3 days, to avoid the circulating water pump due to excessive blockage of sediment.
Temperature when the machine is not necessary, if the room temperature is low, the best pour out the water in the tank, to avoid freezing and cracking the water tank and water pipes.
Ensure that the ambient temperature of the operating room, stone engraving machine best to reach room temperature, at least the operator will not be very cold.Check the applicable temperature of the oil specification, at least to reach the minimum temperature.Temperature on the stone engraving machine is not a big impact, but because the user to the screw with grease, winter also forgot to organise, resulting in every boot running not open, some of the operating room temperature is very low, despite the addition of oil, can still be frozen, the machine does not run.